Irrigation water flushes the Mae Kha canal through town. 16–27 Nov.
Chiang Mai's irrigation project is sending water into the Mae Kha canal at full capacity from 16 to 27 November, on the governor's orders, to ease the canal's water problems and test the supply route before the 2027 dry season. Water comes from the Mae Taeng canal through the Mae Sa outlet, side canals and the Mae Yuak reservoir, with about 0.3 m³ a second running through the city moat and the town centre. On 17 November officials checked points from Don Kaeo in Mae Rim down past Lanna Hospital, the St Peter's floodgate and communities around Chaeng Si Phum. After 27 November the flow will be cut back and a longer-term plan drawn up.